With ongoing leaks damaging interior finishes and passageways, a partial roof replacement and re-work to an old HVAC system project was completed with minimal disruption to the Hotel and Convention Centre’s operations.
PROJECT GOALS
The Hotel and Convention Centre had been experiencing significant internal finish and wall damage due to water infiltration around the stairwell and elevator shaft. After in-house repairs failed to eliminate the leak, the Owner was looking for concise and professional advice to remediate the leaks.
Due to the complex nature of the roof area in which the leaks were occurring, a comprehensive investigation was launched and included:
- A thorough review of the leak history.
- Visual condition assessment and onsite inspection of the existing conditions.
- Full systems review of the HVAC, mechanical and control components.
- Thorough written technical report of all findings and preliminary design options for roof remediation.
- Presentation Proposal outlining various options and scopes to the Owner.
- Prequalification of Roofing and Mechanical Contractors prior to Bid Issuance.
- Development of Design and Bid documents outlining best reroofing option.
- Execution and oversight of the Bidding and Tender Phase with qualified contractors.
- Overall project oversight and services including Contract Management, Payment, Certification, and Quality Assurance Inspections.